|
|
|
![]() ![]() |
Step No. 10 |
| Take-Ups | |
|
It is recommended that a take-up be used on most overhead trolley conveyors. It is always desirable to locate the take-up as soon as possible after the chain leaves the drive unit. (A vertical curve following the drive will also help to remove slack chain). Refer to the Take-Up Section, for a discussion on various types available. After selection has been made, locate the take-up on layout drawing. |